In 2007 “Teplocom” specialists carried out works on energy audit of thermotechnological complex of the plant.
The aim of the works is to develop measures aimed at growth of enterprise productivity and improvement of technical and economic characteristics of its activity such as reduction of consumption of heat and electric energy saving or improving qualitative and quantitative performance of released production.
The system of plant energy consumption was analyzed, existing and expected costs on energy were determined. Measures on reduction of power inputs were worked out.
Efficient technical solutions are determined which have to secure:
- Reduction of specific power inputs;
- Reduction of specific power inputs;
- Improvement of technical and economical performance of the enterprise;
- Growth of ecological security of production.